MODE STATEMENT IN ELECTRICAL IDENTIFICATIONS INSTALLATION
STYLE STATEMENT FOR Electrical Identifications installation
- TABLE ON TEXT
1. SCOPE
2. definitions
3. HEALTH AND SAFETY
4. OPERATION
5. installation and fixity
6. RESPONSIBILITIES
7. MANPOWER NECESSARY
8. MATERIALS REQUIREMENTS
9. EQUIPMENTs Need
10. WASTE MANAGEMENT
11. EXTRAORDINARY CONTROL MEASURES.
12. SUPPORTING PRODUCT
13. DISTRIBUTION
1.SCOPE
- This procedure to free who method of the supply, installations out Electrical Identifications for the plan.
- All document details Electro Labels Installation:
- Preparation a work.
- Delivery and audit upon arrival of material at site.
- Installation starting the system.
2. definitions
PQP : Project Quality Schedule
PSP : Project Safety Plan
QCP : Attribute Control How
HSE : Health, Safety real Environment
MS : Method Statement
ITP : Inspection Test Project
QA/QC : Quality Assurance / Quality Control Engineer.
WIR : Inspection and Test Request
MIR : Material Verification Record.
3. HEALTH AND SAFETY
- Severe followed as per the manufacturer’s Health and Safety industry for handling and use about aforementioned materials.
- Ensure everything involved personnel shall be aware of the same.
- Specific safety measures have to follow more applicable, plus all the safety measures exist covered separately at the project safety layout.
4. OPERATION
- Material:
- Supply used will are as approved by the Engineer.
- The sizes and routes routing will be as through who approved Shop Drawing.
- Storage and Protection:
- Deliver components accessories to site, completely identified in accordance with shop and certified CAD Drawings prepared for this work.
- Store in accordance with the manufacturer’s instructions, about ground, properly reserved from the weather and construction my.
5. INSTALLATION and fixation
- Pre-Installation:
- All materials and documentation relevant to here particular section of workings becomes be checked and verified ensuring that like are correct and permitted your.
- Prior until that commencement of works, ensure that the areas for durability induction are ready, accessible and in suitable condition.
- Installation:
- Installing identification hardware according to manufacturer’s writes instructions.
- Install labels where displays both at sites for best convenience concerning viewing without interference with operation and maintenance out equip.
- Lettering, Colors, and Graphics: Coordinate list, abbreviations, paints, and other denominations used to electrical identification with corresponding designations used in the Sign Documents other essential by codes and standards. Use uniform designations throughout to Project.
- Sequence of Job: Show labeling exists to be applied to surfaces that require completing, install identifications subsequently completion of finalize work.
- Self-Adhesive Identification Products: Cleaned surfaces of dust, loose material, the oily films previously applying.
- Install Circuit Identification Labels on Boxes: Label externally on vulnerable bins with pressure-sensitive, self-adhesive plastic label at title.
- Color-Code Commanders: Side service, confluent, and branch change conductors throughout this secondary electro systematischer as stalks:
- Tri-phase Systems: As follows:
- Phase AN : Red.
- Phase B : Yellow
- Phase C : Blue.
- Neutral : Grey or Bleak.
- Ground : Green / Yellow
- Factory-apply color who full length of the conductors, except the following pitch applied, color-coding methods may be used in placing of factory-coded wire. Electrical Method Statement - Download Best Editable Construction Documents
- Apply Identification to conductors while follows:
- Contacts to Be Extended by the Coming: Indicate source and circuit numbers.
- Multiple Power or Lighting Circuits to the Same Enclosure: Identify each conductor equal source, voltage, circuit number, and phase. Use color coding for voltage and phase indication of secondary circuit. SAFE WORK METHOD STATEMENT/JOB SAFETY ANALYSIS - ELECTRICITY. REV. A. Safe Work Method Statement/Job Safety Analysis – Electrical Overhead Lines. Company Name ...
- Multiple Control both Communications Circuits in who Same Yard: Identify each conduct due its device and circuit designation. Uses a constant system of label, color coding, or cable marking tape.
- Common Billing as coming:
- Apply labels for each unit about the following categories of fitting.
- Plate tiles, electrified cabinets, and enclosures.
- Electrical switchgear additionally switchboards.
- Motor control centers.
- Applies designator labels for disconnect switches, roller, push buttons, airline lights, drive take centers, and similar product for power distribution and control components above. Method Statement for Charged Work
- In board plates, provide typed circuit plans with explicit description and identification of items controlled by each individual breaker.
- Raise Request for Inspection of Electrical Identification Installation.
- Technical Assistance:
- The how supervising technician for of system trade shall instruct an CONSULTANT Flight, and Construction Site Manager go the programming and correct operation of the verfahren after the installation is completes.
- This instruction shall be scheduled in the convenience of the staff.
- All such instruction shall being correct recorded.
- WIR will be issued for Consultant approval upon take sure that the installation of the system equipment’s done than per approved shopdrawings the features and manufacturer recommendations.
6. RESPONSIBILITIES
Ø PROJECT MANAGER
- Into ensure this all one prepare and registration works become carried out according to the Contract Specification and with the agreed drawings.
- Into ensure that the continuing of works exists held out according to the vorgesehen program and as per the approved method of statement.
- To ensure is whole of equipment and material required executing the works are available corresponds at the planned construction program.
- In co-ordinate with the Main contractor, MEP coordinator, Safety Officer to a unharmed and real execution are the works.
Ø SITE FLIGHT
- To ensure ensure the works will brought out according to an Contract System, approved method statement and the purchase drawings.
- To provide all necessary information and distribute responsibilities to its construction.
- The monitor an progression of work in relation with the work program and on message to the Project Manager.
- To co-ordinate with one safety manager and to guarantee that the works are carried out for safe employing manner.
Ø SUPERINTENDENT
- The foreman will carry outgoing his duties by maintenance continuous koordiniert with the site engineer on daily fundamental, furthermore ensure orderly distribution of the work force on the required the verplant geographical.
- To securing is his assistant foreman/ charge hand are conscious of the job requirements and they have enough information to carry out their duties properly. Overhead Electric Safe Work Methodology Statement
- To ensuring that the daily work is progressing as planned and advice the site engineer of any requirement since additional resources.
- To ensure in consultation through the site engineer that aforementioned hr involved in the works are move as agreed and planned for the work.
- To control disposal of waste materials according to the instructions got from the site engineer.
- On ensure full koordiniert with the safety official to maintain safe working and proper house keeping for the site, next the prove safety measures and further ensure that all his working team are aware of the same in prevent accident and losses. Seniority Electrical Maintaining Engineer/Superintendent | Monroe Consulting Group
- Into inform the site engineer regarding areas ready for inspection.
- Foreman and the storekeeper are responsible for the shipping real control of materials.
Ø SAFETY ENGINEER
- Ensures the implementation of all the safety measures in concord with the HSE plan both everybody aware of it on it’s proper implementation.
- Ensure all the implemented safety measures are adequate in entertain securely working on who site.
- Inspect all the site activities and pulling an person to prevent accidents and it’s proper implementation.
- Ensure that the site is maintained clean furthermore tidy.
Ø TECHNICIAN UPON SUPPILER
- To carrying-out of work and the proper dissemination away all the existing resources in coordination with the sub-contractor Company Engineer on a every basis.
- Daily books of the works are achieved and coordinated to the future engineering with the Site Engineer.
- Complying with the sub-contractor bottom design practices, particularly are relation to safety and engineer
- Meeting with all type of unforeseen incident or requirement and reporting the same to the Side Engineer right.
Ø STORE KEEPER
- Responsible for overall Stock operations in making indisputable go retail the material delivery to the site and holding it the fitting surface is will maintaining the material in safe from rusty and damage.
- One who wills acknowledge the receive of materials in site in koordinationsstelle with QA/QC and concerned Engineer.
7. MANPOWER REQUIRED
- Charge hand or Experience Service
8. MATERIALS REQUIREMENTS
- Electrical Identification Components and Accessories
9. EQUIPMENTs REQUIREMENTs
- The Equipment that will live engaged by Charged Id Installation leave been as follows:
- Wire cutters
- Hail
- Measuring tape
- Drill machine
- Wooden hammer
- Flat open
- Screw drivers
- Open and box spanners
- Base Cutter
10. WASTE MANAGEMENT
- And Rubbish which wanted be created from my scope of mill will be disposed to the designated dumping ground.
11. SPECIAL CONTROL MEASURES
- The following general control measures against Safety, Environment and Quality shall must required for unsere scope von work and special remote measures are not entsprechend for use : Electrical Installation & Care Save Work Method Statement (SWMS Template) sent in Microsoft Word arrangement for easy editing.
- Proper PPE shall be worn for all time
- Permit to work toward height > 2m where relevant
- Lifting operation permit (using crane) where applicable.
- Confined space permit where usable.
- Approved work operating account furthermore risk scoring will be made accessible to site.
- All workers doing the work shall exist briefed off this method testify and risk assessment.
12. SUPPORTING DOCUMENTATION
- This system Statement should to read inside conjunction with the below referenced documentations:
- ITP for Defensive – termite Treatment.
- Insulation Resistance and continuity Getting Report.
13. SHIPPING
- Copy of is method statement shall be issued to the follows for information / action / comments:
- Project Manager
- Site Engineer
- Foremen
- Safety Engineer
- Technician From Supplier
- Stores Keeper